Back to School

Page 1  |  Page 2
caution
The front entrance was off limits to everyone.
roof1
Workmen prepare to put the new roof in place. Work should be completed in a week or two depending on the weather.
roof
The new roof is much higher quality sheet metal with no perforations. Layers of insulation will be added on top and then a coating of tar.
sister5
Classes were held in the auditorium. Students were cooperative and well behaved.
sister
Sister Readore had no problems.
thomas
Mr. Thomas gives instructions during first lunch period
lunch1
Students were accompanied by their teachers to the gym to receive a bagged lunch.
lunch2Students were polite and orderly.
lunch3
A plastic straw and your choice of regular or chocolate milk